Our Build

Diary

Roof number two

The roof over the living pod has come on in leaps and bounds over the past couple of days. It’s quite a labour intensive task for the builders to set up all the falls and varying pitches. Plus we have the roof top deck which will float over the top of the actual roof which threw up a small challenge trying to get enough height from the ground floor and up onto the deck in both a functional and aesthetically pleasing manner. But the Haven Renovation guys came up with a great solution we’re really pleased with.

We should have the Terracon crew back in next week to apply the Nuralite 3PM membrane roof over the substructure, just like they did on the bedroom side. Then we’ll be all watertight and hosting a second roof shout!

John running the roof build solo for a while.

John running the roof build solo for a while.

DSC_0184

DSC_0180

DSC_0172

DSC_0175_1

DSC_0278_1

Ovay and John starting to work on another pitch in the roof.

DSC_0272
DSC_0269_1
DSC_0267